Port, Shipyard, Offshore & Industrial Plant
Based on KRE’s various engineering records and excellent manpower, we provide all kinds of technical consulting services(conceptual design, feasibility study, basic layout preparation, technical evaluation and technical specification writing) for the client’s needs in the field of Port, Shipyard, Offshore & Industrial Plant.
Structural Analysis, Wheel Load Calculation
Business Feasibility Study
Technical Consultation & Evaluation, Technical Specification Writing, Bid Document Evaluation
Basic and Detailed Design Review
Conceptual Design
Basic Layout Preparation
Major Projects
No. | Project | Year | Client |
---|---|---|---|
No.1 | ProjectTechnical Assessment for 6 RTGCs | Year2022 | ClientPTP / Papilla Eng. (Malaysia) |
No.2 | ProjectEstablishment of Basic Plan and Feasibility Study for Repair Shipyard in Peru | Year2020~2021 | ClientDohwa Engineering Co., LTD. |
No.3 | ProjectDevelop Pre-diagnostic and Predictive Technology for Cranes (Phase I) | Year2020~2021 | ClientBPA |
No.4 | ProjectModernization and Expansion of the Shipbuilding/Repair Capabilities of vessels(Panamax/Post-Panamax) in Peru | Year2019~2020 | ClientKorea Trade-Investment Promotion Agency |
No.5 | ProjectTechnical Consulting for Structural inspection of 15 RTGCs | Year2020 | ClientPTP / Papilla Eng. (Malaysia) |
No.6 | ProjectConsulting for Smart Port & Industry Activation Strategy | Year2020 ~ | ClientKMI |
No.7 | ProjectConsulting for Core Logistics Technology & R&D Demand in Gyeongnam District | Year2020 | ClientGyeongnam Institute |
No.8 | ProjectDetailed Design for PPFTP Port Equipmenent in Bagladesh | Year2019 | ClientDaeyoung Eng |
No.9 | ProjectConsulting for Railway Rubber Tyred Gantry Crane in Euiwang Inland Container Depot | Year2018 | ClientEuiwang ICD |
No.10 | ProjectConceptual Design for 15000 Ton Goliath Crane for Jurong Shipyard | Year2018 | ClientHanJoong ship machinery |
No.11 | ProjectLicensing Consulting for Harbour Crane Installation | Year2018 | ClientCJ Logistics |
No.12 | ProjectStudy for Container Crane in Busan New Port(2-6 Phase) | Year2018 | ClientKOPEC |
No.13 | ProjectConsulting for Passenger Boarding Bridge in Incheon Cruise Terminal | Year2015 | ClientIncheon Port Authority |
No.14 | ProjectTechnical Consulting for Container Handling Equipment in Algerian New Port | Year2016 | ClientYusin |
No.15 | ProjectLicensing Consulting for RMQC in Pyungtaek Dangjin Port | Year2016 | ClientDongbang |
No.16 | ProjectFeasibility Study for Boryung 3th Port Construction | Year2012 | ClientDohwa ENG. |
No.17 | ProjectTechnical Specification for Ship Loader in Donghae Port | Year2009 | ClientHuman Tech |